Comprehensive Water Environment Management Project of Jiyugang Flood Discharge Canal in Humen Town, Dongguan City
The final process of the integrated equipment in this case is determined as follows: sewage outlet along the river → grid sewage well → pre settling tank → biofilm MBR membrane double membrane treatment equipment+clean water tank
1. Technical features
(1) Rapidly improving multiple water quality indicators, significantly enhancing sensory indicators of water transparency, and achieving a removal rate of over 80% for various pollutants.
(2) Series, modular, and integrated design, with good purification effect, small footprint, low investment, and low operating costs.
(3) It can achieve online self-cleaning, reduce the manpower, material resources, and time costs of equipment maintenance, and achieve the best balance between technology and economy while ensuring the effectiveness of water quality treatment.
2. Processing scale
Strengthen the treatment system, and based on the current water quality and quantity, the treatment capacity is tentatively set at 1500m3/d.